The standard cost worksheet in Business Central
By Emil Björk · Microsoft business apps consultant, Gothenburg
How Business Central's standard cost worksheet helps maintain and revalue standard-cost items — annual cost rolls, what-if analysis, and the GL impact.
On this page (8)
For manufacturers and distributors using standard cost as their inventory costing method, the standard cost worksheet is the tool that maintains and revalues item standards. It supports the annual cost roll, mid-year revaluations, and what-if scenarios — with the GL posting that reconciles inventory value to the new standards.
Why standard cost
Standard cost stabilises inventory valuation independent of fluctuating actual purchase prices. Variances (between standard and actual purchase price, or between standard and actual production cost) post to dedicated variance accounts, making operational deviations visible. Common in manufacturing where production costs should be predictable for pricing and margin analysis, and in distribution for high-volume items where average-cost noise distorts margin.
The annual cost roll
Once a year (typically before the new fiscal year), companies update the standard costs to reflect current input prices, current routing rates, and current overhead allocations. The standard cost worksheet is where this happens:
- Suggest Item Standard Cost — populate the worksheet with current standards for selected items.
- Adjust — calculate new proposed standards based on:
- Current vendor purchase prices for raw materials.
- Current production BOM and routing costs.
- Overhead rate applied to direct costs.
- Review — the worksheet shows old standard, proposed new standard, % change, and the cost components that drove the change.
- Approve and post — apply the new standards. The system updates the item card and posts revaluation journal entries.
Components of standard cost
For a manufactured item, the standard breaks into:
- Material cost — sum of BOM components at their standard.
- Capacity cost — sum of routing operations' setup and run time at work-centre rates.
- Subcontracting cost — for subcontracted operations.
- Capacity overhead — applied as a rate on capacity time.
- Manufacturing overhead — applied as a percentage or fixed amount.
The worksheet rolls these components for each item, giving full transparency into where cost is changing.
Revaluation journals
When the standard changes, the inventory value at the old standard differs from the inventory value at the new standard. The system calculates the difference per location, per item, per variant, and posts a revaluation journal:
- Debit / Credit Inventory (depending on direction of change).
- Offset to Revaluation Variance GL account.
This brings inventory to the new standard cleanly, with audit-trail journal entries for finance reconciliation.
What-if analysis
The worksheet can be run without posting — calculate proposed standards, review the impact, adjust assumptions (e.g. test what a 5% raw material increase does to finished goods), and discard. Useful for budgeting and pricing simulations.
Mid-year revaluation
For items where the annual roll isn't enough — a major commodity price move, a contract renegotiation, a new supplier — the worksheet supports mid-year revaluation of selected items. Same mechanism, smaller scope.
The full inventory implication
Standard cost only works if all transactions post at standard. Sales orders, production orders, transfers, and consumption all use the standard. Variances between standard and actual flow to variance accounts on receipt and on production-order completion. Run Adjust Cost — Item Entries before period-end to capture all variances.
Operational discipline
Document the standard cost roll process as an annual procedure — owner, timing, sign-offs, exception handling. Standard-cost discipline is finance and operations together; the worksheet is the bridge.
Further reading
Related guides
- The cost adjustment job in Business CentralWhy Business Central separates inventory cost adjustment from posting — how the Adjust Cost - Item Entries batch works, when it runs.
- Designing dimensions in Business CentralHow to design a dimension structure that supports the reporting you actually need — global vs shortcut, mandatory rules, defaults, and combinations.
- Bank reconciliation in Business CentralHow bank reconciliation works in Business Central — bank feeds, statement imports, AI-assisted matching, and month-end reconciliation.
- Month-end close in Business CentralA practical month-end close checklist for Business Central — reconciliations, accruals, depreciation, inventory cost adjustment, and locking the period.
- The Business Central finance moduleAn overview of Business Central's financial management — general ledger, dimensions, AP/AR, banking, fixed assets, and intercompany.
Browse every guide in Business Central or just Finance & accounting.
Was this helpful?
Signals which guides land and which need work. No account, no comment box — corrections go through the contact page.
Spot something wrong or want a topic covered? Send a correction or a topic request — both are welcome.